Central Garage Tunnel Closures with Adjusted Access to Domestic Terminals

The Airport will be installing automatic doors within each of the Central Garage Level 1 connector tunnels.  The door installation will require temporary closure of selected connector tunnels.  Garage users will be required to access the Domestic Terminal Complex from the next adjacent connector tunnel; temporary signage and ambassadors will be available to assist and direct passengers during peak periods.

Below is the Tunnel Closure schedule starting December 13, 2018, continuing through February 2019.

 

Central Garage Location Closure Opening

Core B 

(Interim Access through Core C)

Thursday, December 13, 2018 Monday, December 7, 2018

Core C 

(Interim Access through Core B and D)

Thursday, January 3, 2019 Monday, January 7, 2019

Core D 

(Interim Access through Core C and E)

Thursday, January 10, 2019 Monday, January 14, 2019

Core E 

(Interim Access through Core D and F)

Thursday, January 24, 2019 Monday, January 28, 2019

Core F 

(Interim Access through Core E and F/G)

Thursday, January 31, 2019 Monday, February 4, 2019

Core F/G 

(Interim Access through Core F)

Thursday, February 7, 2019 Monday, February 11, 2019


Please contact the SFO Construction Manager at 650.799.1910 if you have any questions.